Small Bathroom Update

This bathroom was updated due to a toilet leak that cause damage to subfloor. New wide plank LVP flooring was installed, along with new baseboard, toilet, vanity, vanity light, vanity mirror, towel/TP holder, and faucets. The light above the vanity was relocated to be centered to the mirror, and outlet was moved to allow tile work to not interfere with GFCI outlet.

Previous
Previous

Issaquah Structural

Next
Next

West Seattle Basement